[{"data":1,"prerenderedAt":1108},["ShallowReactive",2],{"story":3,"header":175,"footer":287,"articles-null":371},["Reactive",4],{"name":5,"created_at":6,"published_at":7,"updated_at":8,"id":9,"uuid":10,"content":11,"slug":161,"full_slug":162,"sort_by_date":163,"position":164,"tag_list":165,"is_startpage":29,"parent_id":167,"meta_data":153,"group_id":168,"first_published_at":169,"release_id":153,"lang":159,"path":153,"alternates":170,"default_full_slug":153,"translated_slugs":153},"Construction of Andfjord Salmon is according to plan","2023-05-30T08:15:50.603Z","2023-06-07T13:29:22.821Z","2023-06-07T13:29:22.849Z",315516810,"45cce09a-3399-4a5a-b3ed-3d1494f4a311",{"SEO":12,"_uid":18,"body":19,"excerpt":16,"component":138,"thumbnail":139,"categories":140,"summary_title":17,"displayAnnouncement":29},{"_uid":13,"title":5,"plugin":14,"og_image":15,"og_title":5,"description":16,"twitter_image":17,"twitter_title":17,"og_description":16,"twitter_description":17},"2b817a5d-9b02-436d-bd8e-121b667a2432","seo_metatags","https://res.cloudinary.com/andfjord/image/upload/v1685434723/Investor/Other/andfjord_salmon_sustainable_landbased_fjord.jpg","The construction of the pool and Andfjord Salmon AS’ facility in Kvalnes is going fast forward and according to plan.\n","","7509514e-47e7-462a-b8dc-3bc6cbc8c94b",[20,36,83,93,131],{"id":17,"_uid":21,"ctas":22,"text":16,"media":23,"title":5,"useH1":30,"overlay":31,"component":34,"content_alignment":35},"410ad5cd-4adb-4300-b839-2e5747133149",[],{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":24,"height":25,"source":17,"filename":15,"copyright":17,"fieldtype":26,"meta_data":17,"public_id":27,"aspect_ratio":28,"is_external_url":29},800,533,"asset","Investor/Other/andfjord_salmon_sustainable_landbased_fjord",1.5009380863039399,false,true,{"value":32,"plugin":33},0,"storyblok-slider","Hero","centre",{"id":17,"_uid":37,"theme":38,"content":39,"component":81,"vertical_padding":82},"3916b928-d263-4a1f-aee4-d7399d651239","DARK",{"type":40,"content":41},"doc",[42,51,57,61,67,71,77],{"type":43,"content":44},"paragraph",[45],{"text":46,"type":47,"marks":48},"March 24, 2020","text",[49],{"type":50},"bold",{"type":43,"content":52},[53],{"text":54,"type":47,"marks":55},"Progress Plan: Status ‍",[56],{"type":50},{"type":43,"content":58},[59],{"text":60,"type":47},"The project management reports that the pool pit, where the pool is going to be located, is 90% complete. The remaining work consists of taking out some mass. The entire progress plan is, as of March 24, 60% complete, considering the release of smolt in the pool late summer this year. This is according to our plans. So are costs and budgets. Andfjord Salmon is very pleased with the work done by the project management and the cooperation between all the different suppliers.‍",{"type":43,"content":62},[63],{"text":64,"type":47,"marks":65},"‍Transportation of the pool:",[66],{"type":50},{"type":43,"content":68},[69],{"text":70,"type":47},"The HighComp pool panels have been completed and loaded on the port in Southern Norway. They will be transported by ship to Risøyhamn shortly. Then they will be transported by special transport to Kvalnes on Andøya just after Easter. The transport will take place at night as the cargo will occupy the road. Then the work of putting together the pool starts.",{"type":43,"content":72},[73],{"text":74,"type":47,"marks":75},"Contracts:‍",[76],{"type":50},{"type":43,"content":78},[79],{"text":80,"type":47},"All key contracts for the completion of the first pool have been signed, most recently a total solution from ABB, which will be responsible for automation, instrumentation, telecommunications and power distribution. Andfjord Salmon is pleased to have secured deliveries from the leading companies in the industry. 90% of the contracts with suppliers are entered into at fixed prices and the majority are in Norwegian kroner. ","RichText","py-6",{"id":17,"_uid":84,"asset":85,"fluid":29,"theme":17,"caption":91,"autoplay":29,"component":92},"6b6f38aa-025c-4a99-895b-17e52473a929",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":86,"height":87,"source":17,"filename":88,"copyright":17,"fieldtype":26,"meta_data":17,"public_id":89,"aspect_ratio":90,"is_external_url":29},1080,810,"https://res.cloudinary.com/andfjord/image/upload/v1685434731/Investor/Other/Andfjord_salmon_landbased_norway_fjord_sustainable.jpg","Investor/Other/Andfjord_salmon_landbased_norway_fjord_sustainable",1.3333333333333333,"The pool panels are soon to be shipped to Vesterålen. Photo: HighComp.","MediaBlock",{"id":17,"_uid":94,"theme":38,"content":95,"component":81,"vertical_padding":82},"aae3b4e4-e81e-43b0-88e5-fa93b4820e3f",{"type":40,"content":96},[97,111,121],{"type":43,"content":98},[99,103,105,107],{"text":100,"type":47,"marks":101},"New CEO/Technical Lead:",[102],{"type":50},{"type":104},"hard_break",{"text":106,"type":47},"Martin Rasmussen (34) takes over as CEO on April 1. Roy Bernt Pettersen prioritizes from that point the board, including running the necessary regulations for phase 2 in the future. Kenneth Jørgensen (38) is recruited as Technical Lead. Jørgensen has many years of experience as a technician and chief engineer in large shipping companies and other companies in Norway.",{"text":108,"type":47,"marks":109},"‍",[110],{"type":50},{"type":43,"content":112},[113,117,118,119],{"text":114,"type":47,"marks":115},"Available Positions:",[116],{"type":50},{"text":108,"type":47},{"type":104},{"text":120,"type":47},"Four operating operators will now be hired. The response to the announcement has been very good. There are 90 applicants for the positions. Andfjord Salmon appears to be an attractive workplace.",{"type":43,"content":122},[123,124,128,129],{"text":108,"type":47},{"text":125,"type":47,"marks":126},"Covid-19:",[127],{"type":50},{"type":104},{"text":130,"type":47},"Large parts of Norwegian businesses are affected by the effects of the coronavirus. The construction of Andfjord Salmon's first facility has so far not been affected in a way that has led to significant delays. Andfjord Salmon has implemented all measures recommended by the FHI (The Norwegian Institute of Public Health) and the authorities. All our employees follow these routines. Like many others, we run extensive home office use wherever practicable. This is a very serious situation for the Norwegian society. Andfjord Salmon takes all the measures needed.",{"id":17,"_uid":132,"link":133,"theme":38,"title":136,"filters":29,"category":17,"LinkLabel":17,"component":137,"pagination":29,"displaySecondRow":29},"1918ae11-770a-4a32-a49b-bd94d790857b",{"id":17,"url":17,"linktype":134,"fieldtype":135,"cached_url":17},"story","multilink","recent news","RecentArticles","Article",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":24,"height":25,"source":17,"filename":15,"copyright":17,"fieldtype":26,"meta_data":17,"public_id":27,"aspect_ratio":28,"is_external_url":29},[141],{"name":142,"created_at":143,"published_at":144,"updated_at":145,"id":146,"uuid":147,"content":148,"slug":151,"full_slug":152,"sort_by_date":153,"position":154,"tag_list":155,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":157,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":160,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"Investor","2023-05-12T14:42:23.429Z","2023-05-30T09:56:01.000Z","2023-05-22T20:54:09.774Z",307118994,"f80f63c9-a7ab-471a-8223-18f97b6db072",{"_uid":149,"name":142,"component":150},"28bbf16f-0cd2-4a64-b479-54c42f523702","Category","investor","en/website/data-items/categories/investor",null,-10,[],307118537,"f6fc6b0c-7909-42b3-ab5f-17a12e88199c","2023-05-30T09:56:01.096Z","default",[],"construction-of-andfjord-salmon-is-according-to-plan","en/website/news/construction-of-andfjord-salmon-is-according-to-plan","2020-03-24",-1560,[142,166],"News",306973806,"74b77eab-96a2-4681-bedd-ecfded7f2475","2020-03-24T13:30:00.000Z",[171],{"id":172,"name":5,"slug":161,"published":29,"full_slug":173,"is_folder":29,"parent_id":174},366511745,"no/website/news/construction-of-andfjord-salmon-is-according-to-plan",366384721,["Reactive",176],{"name":177,"created_at":178,"published_at":179,"updated_at":180,"id":181,"uuid":182,"content":183,"slug":280,"full_slug":281,"sort_by_date":153,"position":32,"tag_list":282,"is_startpage":29,"parent_id":283,"meta_data":153,"group_id":284,"first_published_at":285,"release_id":153,"lang":159,"path":153,"alternates":286,"default_full_slug":153,"translated_slugs":153},"Header","2023-05-05T12:30:45.815Z","2026-05-28T05:06:03.599Z","2026-05-28T05:06:03.612Z",303003408,"739ceecc-39d8-4273-8e5f-e357de104841",{"_uid":184,"logo":185,"component":177,"announcement":191,"announcement_link":209,"announcement_text":212,"primary_menu_items":222,"announcement_enabled":29,"secondary_menu_items":248,"announcement_cta_label":279},"86a39028-1361-4d46-874c-fdc04f28adfc",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":186,"height":187,"source":17,"filename":188,"copyright":17,"fieldtype":26,"meta_data":17,"public_id":189,"aspect_ratio":190,"is_external_url":29},164,50,"https://res.cloudinary.com/andfjord/image/upload/v1683713980/logo_pumtah.svg","logo_pumtah",3.28,[192],{"_uid":193,"enabled":29,"message":194,"cta_link":205,"component":208},"afc78e53-d2fe-43d4-9940-4e362c8cd8b5",{"type":40,"content":195},[196],{"type":43,"attrs":197,"content":198},{"textAlign":153},[199,203],{"text":200,"type":47,"marks":201},"Latest news:",[202],{"type":50},{"text":204,"type":47}," Strong biological performance | First post-smolt sale imminent | New smolt release | Q1 2026 financial results",{"id":206,"url":17,"linktype":134,"fieldtype":135,"cached_url":207},"38d63303-d477-45fd-a50c-076dc0feb1e0","en/website/news/strong-biological-performance-first-post-smolt-sale-imminent-new-smolt-release-q1-2026-financial-results","Announcement",{"id":210,"url":17,"linktype":134,"fieldtype":135,"cached_url":211},"2cece4a2-3931-4348-94a7-ffe9b81511d3","en/website/",{"type":40,"content":213},[214],{"type":43,"content":215},[216,220],{"text":217,"type":47,"marks":218},"Latest:",[219],{"type":50},{"text":221,"type":47}," Andfjord Salmon AS has published its annual report for 2022.",[223,230,236,242],{"_uid":224,"link":225,"label":228,"component":229},"8cb3dad0-2fd4-4b3f-b213-87ae46f8848b",{"id":226,"url":17,"linktype":134,"fieldtype":135,"cached_url":227},"5fe6c44a-b912-4bb6-ab18-1f580614bddf","en/website/our-salmon/","Salmon","Menu Item",{"_uid":231,"link":232,"label":235,"component":229},"e30adbf1-388d-4635-b037-3f5d3b91af8a",{"id":233,"url":17,"linktype":134,"fieldtype":135,"cached_url":234},"f3e1b222-6450-4afb-9f7f-52af33bcfc14","en/website/our-technology/","Technology",{"_uid":237,"link":238,"label":241,"component":229},"458dd74a-d2e9-43b0-bb8a-a86252d1fa5f",{"id":239,"url":17,"linktype":134,"fieldtype":135,"cached_url":240},"000998bc-dfe6-41ef-8f48-11505e000511","en/website/sustainability/","Sustainability",{"_uid":243,"link":244,"label":247,"component":229},"6be6c372-c794-4466-b44f-50574feae1cb",{"id":245,"url":17,"linktype":134,"fieldtype":135,"cached_url":246},"c8f89578-a330-4232-9c00-3a35335c3c8b","en/website/our-investors/","Investors",[249,254,260,266,273],{"_uid":250,"link":251,"label":166,"component":229},"d2272f99-4368-479d-b3b8-00872ceedd2c",{"id":252,"url":17,"linktype":134,"fieldtype":135,"cached_url":253},"0d4d24a0-08c1-40cb-af21-b9d28485507c","en/website/news/",{"_uid":255,"link":256,"label":259,"component":229},"ce59c2d6-696d-4a50-86ce-af52594eb66c",{"id":257,"url":17,"linktype":134,"fieldtype":135,"cached_url":258},"e9bc8c69-fc81-4d95-9247-43036a0bf178","en/website/about-andfjord-salmon","About us",{"_uid":261,"link":262,"label":265,"component":229},"eeeb4e24-cd7a-431a-a31f-941099b336f7",{"id":263,"url":17,"linktype":134,"fieldtype":135,"cached_url":264},"ab95d985-0336-4ad2-b03c-cb50eb73ebee","en/website/about-andfjord-salmon/our-people","People",{"_uid":267,"link":268,"label":271,"component":272},"3b5ac9b7-4dd9-4cf0-a34f-ac323996d903",{"id":269,"url":17,"linktype":134,"fieldtype":135,"cached_url":270},"6a0c4200-81e5-4d74-aafe-c554d02c4af5","en/website/about-andfjord-salmon/career/","Careers","Link",{"_uid":274,"link":275,"label":278,"component":229},"c374ccfe-448f-4980-bab5-9fd346d58cb1",{"id":276,"url":17,"linktype":134,"fieldtype":135,"cached_url":277},"95515fc7-8785-40a3-af1b-6be63d3a798d","en/website/contact-us","Contact us","Read more","header","en/website/global/header",[],303003395,"3d6d97ba-a8dd-4cf9-b2c2-e42b3035d770","2023-05-18T14:55:33.575Z",[],["Reactive",288],{"name":289,"created_at":290,"published_at":291,"updated_at":292,"id":293,"uuid":294,"content":295,"slug":365,"full_slug":366,"sort_by_date":153,"position":154,"tag_list":367,"is_startpage":29,"parent_id":283,"meta_data":153,"group_id":368,"first_published_at":369,"release_id":153,"lang":159,"path":153,"alternates":370,"default_full_slug":153,"translated_slugs":153},"Footer","2023-05-05T12:37:49.386Z","2025-01-10T09:36:40.274Z","2025-01-10T09:36:40.305Z",303004293,"d3229107-d462-4ce0-bbda-b64dd6bfa277",{"_uid":296,"logo":297,"text":298,"component":289,"social_link_items":299,"primary_menu_items":333,"secondary_menu_items":346},"509b6a48-4754-4ad3-b0c5-34eade6fdfa3",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":186,"height":187,"source":17,"filename":188,"copyright":17,"fieldtype":26,"meta_data":17,"public_id":189,"aspect_ratio":190,"is_external_url":29},"Andfjord Salmon is a Norwegian company established in 2014. The company is listed on the Oslo Stock Exchange (ANDF), and based in Kvalnes on the northernmost island of Andøya in Vesterålen, Norway.",[300,317],{"name":301,"created_at":302,"published_at":144,"updated_at":303,"id":304,"uuid":305,"content":306,"slug":309,"full_slug":311,"sort_by_date":153,"position":32,"tag_list":312,"is_startpage":29,"parent_id":313,"meta_data":153,"group_id":314,"first_published_at":315,"release_id":153,"lang":159,"path":153,"alternates":316,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"Facebook","2023-05-09T15:10:35.609Z","2023-05-27T15:07:45.326Z",305034313,"c55b3839-5311-403c-920b-87663c7a170a",{"_uid":307,"link":308,"type":309,"component":310},"d87b00c1-9261-4df9-b8ed-58bd68df6c43","https://www.facebook.com/andfjordsalmon/","facebook","Social_Link","en/website/data-items/social-links/facebook",[],305029574,"7b5125e3-0702-4fe1-a7c4-09670f3a61a1","2023-05-27T15:07:45.305Z",[],{"name":318,"created_at":319,"published_at":144,"updated_at":320,"id":321,"uuid":322,"content":323,"slug":326,"full_slug":327,"sort_by_date":153,"position":328,"tag_list":329,"is_startpage":29,"parent_id":313,"meta_data":153,"group_id":330,"first_published_at":331,"release_id":153,"lang":159,"path":153,"alternates":332,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"LinkedIn","2023-05-09T15:11:29.014Z","2023-05-27T15:07:21.370Z",305034897,"e33ff31b-680d-478d-bfc3-295434c82b68",{"_uid":324,"link":325,"type":326,"component":310},"0659b51e-9e26-47ed-910d-d881e0fa9b69","https://no.linkedin.com/company/andfjord-salmon-as","linkedin","en/website/data-items/social-links/linkedin",-20,[],"4ed643df-d867-472c-8361-2a3042678ff9","2023-05-27T15:07:21.345Z",[],[334,337,340,343],{"_uid":335,"link":336,"label":228,"component":229},"18116b99-845f-46ff-bfc7-90754997f89f",{"id":226,"url":17,"linktype":134,"fieldtype":135,"cached_url":227},{"_uid":338,"link":339,"label":235,"component":229},"a5441a43-fd4c-40d3-898b-cf2b08136102",{"id":233,"url":17,"linktype":134,"fieldtype":135,"cached_url":234},{"_uid":341,"link":342,"label":241,"component":229},"d1d7ee8d-c887-409b-9573-8867f09db9de",{"id":239,"url":17,"linktype":134,"fieldtype":135,"cached_url":240},{"_uid":344,"link":345,"label":247,"component":229},"1d76554a-81d2-4450-83aa-cbbc61076498",{"id":245,"url":17,"linktype":134,"fieldtype":135,"cached_url":246},[347,350,353,356,359],{"_uid":348,"link":349,"label":166,"component":229},"cf6bee35-1c52-41a6-9b6b-f2950789acb2",{"id":252,"url":17,"linktype":134,"fieldtype":135,"cached_url":253},{"_uid":351,"link":352,"label":265,"component":229},"ffa999c3-8688-4276-a9c0-01a4ebb73957",{"id":263,"url":17,"linktype":134,"fieldtype":135,"cached_url":264},{"_uid":354,"link":355,"label":271,"component":272},"c66d1163-cf83-4506-a4b1-f3aa77f9e47d",{"id":269,"url":17,"linktype":134,"fieldtype":135,"cached_url":270},{"_uid":357,"link":358,"label":278,"component":229},"e86f846a-31b1-4b87-b352-5937243eeb23",{"id":276,"url":17,"linktype":134,"fieldtype":135,"cached_url":277},{"_uid":360,"link":361,"label":364,"component":229},"cd7b6718-eea3-4f30-bcfa-7179f63f1aa3",{"id":362,"url":17,"linktype":134,"fieldtype":135,"cached_url":363},"d410e4ce-3882-4b48-8ad2-04668dc24c16","en/website/privacy-policy","Privacy Policy","footer","en/website/global/footer",[],"009a1060-5bbc-4ae2-bfdc-aa9afc00064b","2023-05-23T07:41:01.556Z",[],{"data":372,"headers":1082,"perPage":1106,"total":1107},{"stories":373,"cv":1063,"rels":1064,"links":1081},[374,757,912],{"name":375,"created_at":376,"published_at":377,"updated_at":378,"id":379,"uuid":206,"content":380,"slug":750,"full_slug":207,"sort_by_date":751,"position":752,"tag_list":753,"is_startpage":29,"parent_id":167,"meta_data":153,"group_id":754,"first_published_at":755,"release_id":153,"lang":159,"path":153,"alternates":756,"default_full_slug":153,"translated_slugs":153},"Strong biological performance | First post-smolt sale imminent | New smolt release | Q1 2026 financial results ","2026-05-27T18:15:07.661Z","2026-05-28T12:14:40.193Z","2026-05-28T12:14:40.215Z",181109177068399,{"SEO":381,"_uid":387,"body":388,"excerpt":17,"component":138,"thumbnail":732,"categories":734,"summary_title":383,"newsletter_signup":17,"back_to_top_button":17,"displayAnnouncement":29},{"_uid":382,"title":383,"plugin":14,"og_image":384,"og_title":383,"description":385,"twitter_image":17,"twitter_title":17,"og_description":386,"twitter_description":17},"bbc3076f-f625-4441-bbfb-87627cd0a27c","Strong biological performance | First post-smolt sale imminent | New smolt release | Q1 2026 financial results","https://res.cloudinary.com/andfjord/image/upload/t_Facebook-Image/v1779807655/Salmon/Salmon%20in%20pool/Andfjord_Salmon_Land-based_Farming_Pool_K1.jpg","Andfjord Salmon today reports continued strong biological performance and operational metrics across its two operational pools – K0 and K1 – at Kvalnes, Andøya. The company today also announces that smolt release in pool K3 is in process, and that the first sale of post-smolt from pool K1 will take place in mid-June.\n\n","Andfjord Salmon today reports continued strong biological performance and operational metrics across its two operational pools – K0 and K1 – at Kvalnes, Andøya. The company today also announces that smolt release in pool K3 is in process, and that the first sale of post-smolt from pool K1 will take place in mid-June.\n","734e9a57-b2d6-4ef2-b78a-aebf526d3119",[389,401,718],{"id":17,"_uid":390,"ctas":391,"text":17,"media":392,"title":375,"useH1":30,"overlay":399,"component":34,"show_down_arrow":30,"content_alignment":35},"e6fdb17d-54c1-43ca-9831-cffbc5cb1277",[],{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":393,"height":394,"source":17,"filename":395,"copyright":17,"fieldtype":26,"meta_data":396,"public_id":397,"aspect_ratio":398,"is_external_url":29},7588,5059,"https://res.cloudinary.com/andfjord/image/upload/v1779807655/Salmon/Salmon%20in%20pool/Andfjord_Salmon_Land-based_Farming_Pool_K1.jpg",{},"Salmon/Salmon in pool/Andfjord_Salmon_Land-based_Farming_Pool_K1",1.499901166238387,{"value":400,"plugin":33},25,{"id":17,"_uid":402,"theme":38,"content":403,"component":81,"vertical_padding":717},"63468a6e-ad6b-48bf-8bf8-e76ca10fa407",{"type":40,"content":404},[405,412,419,421,435,437,448,450,461,467,472,482,514,520,550,555,560,565,570,575,580,585,590,595,600,605,610,615,620,625,639,644,649,660,666,673,686,693,705,710,715],{"type":43,"attrs":406,"content":407},{"textAlign":153},[408],{"text":409,"type":47,"marks":410},"28 May 2026",[411],{"type":50},{"type":43,"attrs":413,"content":414},{"textAlign":153},[415],{"text":416,"type":47,"marks":417},"Andfjord Salmon Group AS (\"Andfjord Salmon\" or \"the company\") today reports continued strong biological performance and operational metrics across its two operational pools – K0 and K1 – at Kvalnes, Andøya. The company today also announces that smolt release in pool K3 is in process, and that the first sale of post-smolt from pool K1 will take place in mid-June.  ",[418],{"type":50},{"type":43,"attrs":420},{"textAlign":153},{"type":422,"attrs":423},"blok",{"id":424,"body":425},"92c6fd23-2ea6-4341-94ec-f05884c92874",[426],{"_uid":427,"icon":428,"link":430,"label":433,"component":434},"i-34af60b6-994c-4464-bdc6-63a3058fc46a",{"id":153,"alt":153,"name":17,"focus":153,"title":153,"source":153,"filename":17,"copyright":153,"fieldtype":26,"meta_data":429},{},{"id":17,"url":431,"linktype":432,"fieldtype":135,"cached_url":431},"https://res.cloudinary.com/andfjord/image/upload/v1779917063/Investor/Reports/Q1_2026_Andfjord_Salmon_Quarterly_Report.pdf","url","Q1 2026 Report","DefaultButton",{"type":43,"attrs":436},{"textAlign":153},{"type":422,"attrs":438},{"id":439,"body":440},"fa5aa90a-eb18-4c74-bba2-39f82eb3a735",[441],{"_uid":442,"icon":443,"link":445,"label":447,"component":434},"i-e8c2de09-8b7c-4b40-8306-1b96fdced4f4",{"id":153,"alt":153,"name":17,"focus":153,"title":153,"source":153,"filename":17,"copyright":153,"fieldtype":26,"meta_data":444},{},{"id":17,"url":446,"linktype":432,"fieldtype":135,"cached_url":446},"https://res.cloudinary.com/andfjord/image/upload/v1779912400/Investor/Reports/Q1_2026_presentation.pdf","Q1 2026 Presentation",{"type":43,"attrs":449},{"textAlign":153},{"type":422,"attrs":451},{"id":452,"body":453},"1fc194cb-ee6c-4a8d-8fbc-c6aa03c2d077",[454],{"_uid":455,"icon":456,"link":458,"label":460,"component":434},"i-d259696c-dc72-4c51-abee-b6356e869d08",{"id":153,"alt":153,"name":17,"focus":153,"title":153,"source":153,"filename":17,"copyright":153,"fieldtype":26,"meta_data":457},{},{"id":17,"url":459,"linktype":432,"fieldtype":135,"cached_url":459},"https://res.cloudinary.com/andfjord/video/upload/v1779970344/Videos/Quarterly%20videos/Andfjord_Salmon_Presentation_Q1_2026.mp4","Q1 2026 Webcast",{"type":43,"attrs":462,"content":463},{"textAlign":153},[464,465],{"type":104},{"text":466,"type":47},"Survival rates in pools K0 and K1 remain above 99%, which is impressive considering that the fish have now spent eight and six-and-a-half months in their respective pools. Total standing biomass currently stands at 1,584 tonnes of live salmon.  ",{"type":43,"attrs":468,"content":469},{"textAlign":153},[470],{"text":471,"type":47},"\"The solid biological conditions are also reflected in the salmon’s weight gain and the resulting biomass growth. We also maintain efficient feed utilization. Overall, we are very satisfied with our fish farming performance, and we look forward to replicating this in more pools going forward,” says Martin Rasmussen, CEO of Andfjord Salmon.  ",{"type":473,"attrs":474,"content":476},"heading",{"level":475,"textAlign":153},4,[477,479,480],{"text":478,"type":47},"STATUS POOL K0",{"type":104},{"text":481,"type":47},"(all numbers per 27 May 2026) ",{"type":483,"content":484},"bullet_list",[485,493,500,507],{"type":486,"content":487},"list_item",[488],{"type":43,"attrs":489,"content":490},{"textAlign":153},[491],{"text":492,"type":47},"Survival rate: 99.17% ",{"type":486,"content":494},[495],{"type":43,"attrs":496,"content":497},{"textAlign":153},[498],{"text":499,"type":47},"Average weight: 2,102 grams ",{"type":486,"content":501},[502],{"type":43,"attrs":503,"content":504},{"textAlign":153},[505],{"text":506,"type":47},"Feed conversion ratio (FCR): 1.03 ",{"type":486,"content":508},[509],{"type":43,"attrs":510,"content":511},{"textAlign":153},[512],{"text":513,"type":47},"Standing biomass in pool: 727 tonnes live salmon ",{"type":473,"attrs":515,"content":517},{"level":516,"textAlign":153},2,[518],{"text":519,"type":47},"STATUS POOL K1 ",{"type":483,"content":521},[522,529,536,543],{"type":486,"content":523},[524],{"type":43,"attrs":525,"content":526},{"textAlign":153},[527],{"text":528,"type":47},"Survival rate: 99.24 % ",{"type":486,"content":530},[531],{"type":43,"attrs":532,"content":533},{"textAlign":153},[534],{"text":535,"type":47},"Average weight: 1,150 grams ",{"type":486,"content":537},[538],{"type":43,"attrs":539,"content":540},{"textAlign":153},[541],{"text":542,"type":47},"FCR: 0.93 ",{"type":486,"content":544},[545],{"type":43,"attrs":546,"content":547},{"textAlign":153},[548],{"text":549,"type":47},"Standing biomass in pool: 857 tonnes live salmon ",{"type":473,"attrs":551,"content":552},{"level":516,"textAlign":153},[553],{"text":554,"type":47},"INAUGURAL POST-SMOLT SALE ",{"type":43,"attrs":556,"content":557},{"textAlign":153},[558],{"text":559,"type":47},"On 20 April, Andfjord Salmon announced that it had entered into a strategic post-smolt partnership with Eidsfjord Sjøfarm. The first sale of post-smolt under this partnership has now been agreed for mid-June – ahead of schedule, driven by stronger-than-expected growth in pool K1. Approximately 450,000 post-smolt will be sold from pool K1 at Kvalnes to Eidsfjord Sjøfarm. Around 300,000 fish will be retained in K1 for grow-out purposes.  ",{"type":43,"attrs":561,"content":562},{"textAlign":153},[563],{"text":564,"type":47},"“Our inaugural post-smolt sale is an important milestone as it demonstrates how our infrastructure solutions enable scaling and optimization of pool capacity and production, which shortens our runway to revenue and improves our cash flow. We look forward to proving this in practice in mid-June,” adds Martin Rasmussen.  ",{"type":43,"attrs":566,"content":567},{"textAlign":153},[568],{"text":569,"type":47},"The partnership with Eidsfjord Sjøfarm also secures Andfjord Salmon smolt sourcing and a processing agreement with Holmøy Havbruk.  ",{"type":473,"attrs":571,"content":572},{"level":516,"textAlign":153},[573],{"text":574,"type":47},"SMOLT RELEASE POOL K3 ",{"type":43,"attrs":576,"content":577},{"textAlign":153},[578],{"text":579,"type":47},"Following successful testing of pool K3’s flow through system and pool infrastructure throughout April and May, approximately 550,000 smolt are being released into pool K3, which becomes the third pool in operation at Kvalnes. Average weight per smolt is around 120 grams. The smolt were purchased from Eidsfjord Sjøfarm as part of the cooperation between the parties. All 550,000 smolt are expected to be used for post-smolt production.  ",{"type":43,"attrs":581,"content":582},{"textAlign":153},[583],{"text":584,"type":47},"“The initiation of fish farming operations in pool K3 represents further scale-up of operations at Kvalnes, with more pools to follow later this year,” says Martin Rasmussen.  ",{"type":473,"attrs":586,"content":587},{"level":516,"textAlign":153},[588],{"text":589,"type":47},"FIXED-PRICE CONTRACT FOR POOLS K5 AND K7 ",{"type":43,"attrs":591,"content":592},{"textAlign":153},[593],{"text":594,"type":47},"Andfjord Salmon has entered into fixed-price contracts with Entreprenør Harald Nilsen AS for the construction of pools K5 and K7 at Kvalnes. Entreprenør Harald Nilsen AS is the same contractor currently completing pools K2 and K4, where the company is highly satisfied with the quality and progress of the work delivered to date. Securing the next two pools on a fixed-price basis provides cost certainty for the continued build-out at Kvalnes. ",{"type":473,"attrs":596,"content":597},{"level":516,"textAlign":153},[598],{"text":599,"type":47},"Q1 2026 RESULTS  ",{"type":43,"attrs":601,"content":602},{"textAlign":153},[603],{"text":604,"type":47},"Andfjord Salmon is currently in the middle of production cycles ahead of its first post-smolt sale planned for mid-June. Total operating income in Q1 2026 was therefore limited to NOK 0.1 million (Q1 2025: NOK 0 million). The company reported a net loss of NOK 23.9 million in the first quarter (Q1 2025: net loss of NOK 18 million).  ",{"type":43,"attrs":606,"content":607},{"textAlign":153},[608],{"text":609,"type":47},"Andfjord Salmon has further strengthened its bank financing during the quarter. The total facility has been increased by NOK 200 million to NOK 1.5 billion, of which NOK 600 million is currently undrawn. The interest terms are highly competitive and represent a material improvement compared to the previous facility, providing Andfjord Salmon with a solid funding platform for the ongoing build-out at Kvalnes. ",{"type":473,"attrs":611,"content":612},{"level":516,"textAlign":153},[613],{"text":614,"type":47},"PRESENTATION AT 08:00 (CEST) TODAY ",{"type":43,"attrs":616,"content":617},{"textAlign":153},[618],{"text":619,"type":47},"Andfjord Salmon will provide an operational update and present the company's first quarter 2026 results at 08:00 today. The presentation will be held physically in Oslo and streamed online.  ",{"type":43,"attrs":621,"content":622},{"textAlign":153},[623],{"text":624,"type":47},"Venue for presentation: House of Oslo (the auditorium), Ruseløkkveien 34, 0251 Oslo, Norway ",{"type":43,"attrs":626,"content":627},{"textAlign":153},[628,630,637],{"text":629,"type":47},"The presentation will also be streamed from this ",{"text":631,"type":47,"marks":632},"link",[633],{"type":631,"attrs":634},{"href":635,"uuid":153,"anchor":153,"target":636,"linktype":432},"https://qcnl.tv/p/aGn-LKO2QZdlbN4fPUHgHw ","_self",{"text":638,"type":47},".  ",{"type":43,"attrs":640,"content":641},{"textAlign":153},[642],{"text":643,"type":47},"The presentation material is enclosed to this announcement. ",{"type":473,"attrs":645,"content":646},{"level":516,"textAlign":153},[647],{"text":648,"type":47},"PHOTOS ",{"type":43,"attrs":650,"content":651},{"textAlign":153},[652,658],{"text":653,"type":47,"marks":654},"Download photos",[655],{"type":631,"attrs":656},{"href":657,"uuid":153,"anchor":153,"target":636,"linktype":432},"https://collection.cloudinary.com/andfjord/c0ebc433f8209f0dab64fbcc0cd01b7b",{"text":659,"type":47}," from Kvalnes.",{"type":473,"attrs":661,"content":662},{"level":516,"textAlign":153},[663,664],{"type":104},{"text":665,"type":47},"CONTACTS",{"type":43,"attrs":667,"content":668},{"textAlign":153},[669],{"text":670,"type":47,"marks":671},"Investors:",[672],{"type":50},{"type":43,"attrs":674,"content":675},{"textAlign":153},[676,678,684],{"text":677,"type":47},"Bjarne Martinsen, CFO, Andfjord Salmon Group AS, +47 975 08 345,   ",{"text":679,"type":47,"marks":680},"bjarne.martinsen@andfjord.no",[681],{"type":631,"attrs":682},{"href":683,"uuid":153,"anchor":153,"target":153,"linktype":432},"mailto:bjarne.martinsen@andfjord.no",{"text":685,"type":47},"  ",{"type":43,"attrs":687,"content":688},{"textAlign":153},[689],{"text":690,"type":47,"marks":691},"Media: ",[692],{"type":50},{"type":43,"attrs":694,"content":695},{"textAlign":153},[696,698],{"text":697,"type":47},"Martin Rasmussen, CEO, Andfjord Salmon Group AS, +47 975 08 665,  ",{"text":699,"type":47,"marks":700},"martin@andfjord.no ",[701],{"type":631,"attrs":702},{"href":703,"uuid":153,"anchor":153,"target":636,"linktype":704},"martin@andfjord.no","email",{"type":473,"attrs":706,"content":707},{"level":516,"textAlign":153},[708],{"text":709,"type":47},"ABOUT ANDFJORD SALMON",{"type":43,"attrs":711,"content":712},{"textAlign":153},[713],{"text":714,"type":47},"Located at Andøya on the Arctic Archipelago of Vesterålen, Norway, Andfjord Salmon is developing the world's most sustainable and fish-friendly aquaculture facility of its kind. Through a proprietary flow-through system, Andfjord Salmon combines the best from ocean and land-based salmon farming. In its first production cycle, the company achieved an industry-leading survival rate of 97.5 percent, feed conversion ratio of 1.05, superior share of 91.1 percent, and required 1 kWh to produce one kilo of salmon. ",{"type":43,"attrs":716},{"textAlign":153},"py-6 md:py-20",{"id":17,"_uid":719,"name":17,"text":720,"items":723,"theme":17,"layout":724,"ctaLink":17,"ctaText":17,"heading":725,"category":726,"overline":17,"pageType":727,"component":728,"ctaPosition":729,"useCategory":30,"featuredItem":730,"numberOfStories":731},"1393e0cb-dea8-42f6-8e06-88b866aeffb5",{"type":40,"content":721},[722],{"type":43},[],"grid","Latest news","0dc817f0-39cf-4fe0-8361-e75f2c4c3ead","all","ContentCollection","right",[],"6",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":393,"height":394,"source":17,"filename":384,"copyright":17,"fieldtype":26,"meta_data":733,"public_id":397,"aspect_ratio":398,"is_external_url":29},{},[735,739],{"name":142,"created_at":143,"published_at":144,"updated_at":145,"id":146,"uuid":147,"content":736,"slug":151,"full_slug":152,"sort_by_date":153,"position":154,"tag_list":737,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":157,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":738,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},{"_uid":149,"name":142,"component":150},[],[],{"name":166,"created_at":740,"published_at":741,"updated_at":742,"id":743,"uuid":726,"content":744,"slug":745,"full_slug":746,"sort_by_date":153,"position":154,"tag_list":747,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":748,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":749,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"2023-05-22T18:48:11.233Z","2023-05-31T20:58:53.593Z","2023-05-31T20:58:53.619Z",311552677,{"_uid":149,"name":166,"component":150},"news","en/website/data-items/categories/news",[],"ad1da41c-1fcc-49e0-997f-6c6067a49963",[],"strong-biological-performance-first-post-smolt-sale-imminent-new-smolt-release-q1-2026-financial-results","2026-05-28",-3410,[142,166],"9314b089-d05d-4a7c-a86a-df8d924d7f45","2026-05-28T04:52:46.398Z",[],{"name":758,"created_at":759,"published_at":760,"updated_at":761,"id":762,"uuid":763,"content":764,"slug":904,"full_slug":905,"sort_by_date":906,"position":907,"tag_list":908,"is_startpage":29,"parent_id":174,"meta_data":153,"group_id":909,"first_published_at":910,"release_id":153,"lang":159,"path":153,"alternates":911,"default_full_slug":153,"translated_slugs":153},"Invitasjon til presentasjon av resultater fra første kvartal 2026","2026-05-22T05:33:37.243Z","2026-05-22T05:54:12.809Z","2026-05-22T05:54:12.824Z",179152557105644,"42ccace9-e95c-4e56-ad1b-b1e7b265910a",{"SEO":765,"_uid":769,"body":770,"excerpt":17,"component":138,"thumbnail":871,"categories":874,"summary_title":17,"newsletter_signup":17,"back_to_top_button":17,"displayAnnouncement":29},{"_uid":766,"title":758,"plugin":14,"og_image":767,"og_title":758,"description":768,"twitter_image":17,"twitter_title":17,"og_description":768,"twitter_description":17},"af58ee88-6e95-496b-b25b-2a958a407980","https://res.cloudinary.com/andfjord/image/upload/t_Facebook-Image/v1679660752/Nature/andfjord-salmon-esg-landbased-norway-atlantic-fjords-andoy-arctic.jpg","Andfjord Salmon Group AS (Andfjord Salmon) inviterer investorer, analytikere, långivere og media til en operasjonell oppdatering og presentasjon av selskapets finansielle resultater for første kvartal 2026.","ffcaf600-61a9-4723-afee-e62faa3bd0b8",[771,782],{"id":17,"_uid":772,"ctas":773,"text":17,"media":774,"title":758,"useH1":30,"overlay":781,"component":34,"show_down_arrow":30,"content_alignment":35},"a878e290-f272-4b85-b174-b351cc695fa8",[],{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":775,"height":776,"source":17,"filename":777,"copyright":17,"fieldtype":26,"meta_data":778,"public_id":779,"aspect_ratio":780,"is_external_url":29},5272,2962,"https://res.cloudinary.com/andfjord/image/upload/v1679660733/Nature/andfjord-salmon-invest-investors-sustainable-sustainability-atlantic-seafood-premium-landbased.jpg",{},"Nature/andfjord-salmon-invest-investors-sustainable-sustainability-atlantic-seafood-premium-landbased",1.7798784604996625,{"value":187,"plugin":33},{"id":17,"_uid":783,"theme":38,"content":784,"component":81,"vertical_padding":717},"0cead419-3652-4944-94d2-dd271a5d79cd",{"type":40,"content":785},[786,791,797,802,807,812,817,830,835,840,847,854,859,866],{"type":43,"attrs":787,"content":788},{"textAlign":153},[789],{"text":790,"type":47},"22. mai 2026",{"type":43,"attrs":792,"content":793},{"textAlign":153},[794],{"text":768,"type":47,"marks":795},[796],{"type":50},{"type":43,"attrs":798,"content":799},{"textAlign":153},[800],{"text":801,"type":47},"Dato: Torsdag 28. mai 2026",{"type":43,"attrs":803,"content":804},{"textAlign":153},[805],{"text":806,"type":47},"Tid: 08:00 CET",{"type":43,"attrs":808,"content":809},{"textAlign":153},[810],{"text":811,"type":47},"Presentatører: administrerende direktør Martin Rasmussen og økonomidirektør Bjarne Martinsen",{"type":43,"attrs":813,"content":814},{"textAlign":153},[815],{"text":816,"type":47},"Presentasjonen vil bli holdt fysisk i Oslo og strømmet på nett.",{"type":43,"attrs":818,"content":819},{"textAlign":153},[820,822,828],{"text":821,"type":47},"Sted: House of Oslo (auditoriet), Ruseløkkveien 34, 0251 Oslo, Norge Presentasjonen vil også bli strømmet fra denne ",{"text":823,"type":47,"marks":824},"linken",[825],{"type":631,"attrs":826},{"href":827,"uuid":153,"anchor":153,"target":636,"linktype":432},"https://qcnl.tv/p/aGn-LKO2QZdlbN4fPUHgHw",{"text":829,"type":47},".",{"type":43,"attrs":831,"content":832},{"textAlign":153},[833],{"text":834,"type":47},"Presentasjonen vil bli holdt på engelsk. Spørsmål kan sendes inn under direktesendingen.",{"type":43,"attrs":836,"content":837},{"textAlign":153},[838],{"text":839,"type":47},"Presentasjonsmaterialet vil bli publisert samme dag kl. 07:00 CET.",{"type":473,"attrs":841,"content":842},{"level":516,"textAlign":153},[843],{"text":844,"type":47,"marks":845},"KONTAKTER",[846],{"type":50},{"type":43,"attrs":848,"content":849},{"textAlign":153},[850],{"text":851,"type":47,"marks":852},"Media:",[853],{"type":50},{"type":43,"attrs":855,"content":856},{"textAlign":153},[857],{"text":858,"type":47},"Martin Rasmussen, administrerende direktør, Andfjord Salmon AS, +47 975 08 665, martin@andfjord.no",{"type":43,"attrs":860,"content":861},{"textAlign":153},[862],{"text":863,"type":47,"marks":864},"Investorer:",[865],{"type":50},{"type":43,"attrs":867,"content":868},{"textAlign":153},[869],{"text":870,"type":47},"Bjarne Martinsen, økonomidirektør, Andfjord Salmon AS, +47 975 08 345, bjarne.martinsen@andfjord.no",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":775,"height":776,"source":17,"filename":767,"copyright":17,"fieldtype":26,"meta_data":872,"public_id":873,"aspect_ratio":780,"is_external_url":29},{},"Nature/andfjord-salmon-esg-landbased-norway-atlantic-fjords-andoy-arctic",[875,889],{"name":876,"created_at":877,"published_at":878,"updated_at":879,"id":880,"uuid":881,"content":882,"slug":883,"full_slug":884,"sort_by_date":153,"position":154,"tag_list":885,"is_startpage":29,"parent_id":886,"meta_data":153,"group_id":887,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":888,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"Nyheter","2023-09-06T09:21:23.994Z","2023-11-21T13:13:01.000Z","2023-09-18T13:07:52.913Z",366368883,"fbd74d72-0f69-4d51-8f66-a6bb5553c215",{"_uid":149,"name":876,"component":150},"nyheter","no/website/data-items/categories/nyheter",[],366368874,"ff1a45e7-2680-4351-8915-775bd3fcb386",[],{"name":890,"created_at":891,"published_at":878,"updated_at":892,"id":893,"uuid":894,"content":895,"slug":897,"full_slug":898,"sort_by_date":153,"position":899,"tag_list":900,"is_startpage":29,"parent_id":886,"meta_data":153,"group_id":901,"first_published_at":902,"release_id":153,"lang":159,"path":153,"alternates":903,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},"Investorer","2023-10-25T10:29:04.879Z","2023-10-25T10:29:34.089Z",394800417,"34531876-e012-43c5-a7d5-1249294eefb2",{"_uid":896,"name":890,"component":150},"eecc10d7-60ab-4356-864f-b97845331e19","investorer","no/website/data-items/categories/investorer",-30,[],"51853609-e3db-4840-9023-61735cb0d8d2","2023-10-25T10:29:34.068Z",[],"invitasjon-til-presentasjon-av-resultater-fra-forste-kvartal-2026","no/website/news/invitasjon-til-presentasjon-av-resultater-fra-forste-kvartal-2026","2026-05-22",-1060,[890,876],"51d125fb-ddbf-4991-b121-1df6a9b74c33","2026-05-22T00:00:00.000Z",[],{"name":913,"created_at":914,"published_at":915,"updated_at":916,"id":917,"uuid":918,"content":919,"slug":1057,"full_slug":1058,"sort_by_date":906,"position":1059,"tag_list":1060,"is_startpage":29,"parent_id":167,"meta_data":153,"group_id":1061,"first_published_at":910,"release_id":153,"lang":159,"path":153,"alternates":1062,"default_full_slug":153,"translated_slugs":153},"Invitation to Q1 2026 results presentation","2026-05-21T12:02:33.774Z","2026-05-22T05:54:00.743Z","2026-05-22T05:54:00.759Z",178894249138685,"c89038e5-db0e-45e6-af33-ccb303239eb7",{"SEO":920,"_uid":925,"body":926,"excerpt":17,"component":138,"thumbnail":1046,"categories":1048,"summary_title":17,"newsletter_signup":17,"back_to_top_button":17,"displayAnnouncement":29},{"_uid":921,"title":913,"plugin":14,"og_image":922,"og_title":913,"description":923,"twitter_image":17,"twitter_title":17,"og_description":924,"twitter_description":17},"35c8f92c-c059-4f0b-b23e-a6b0d8e9226d","https://res.cloudinary.com/andfjord/image/upload/t_Facebook-Image/v1679660733/Nature/andfjord-salmon-invest-investors-sustainable-sustainability-atlantic-seafood-premium-landbased.jpg","Andfjord Salmon invites investors, analysts, lenders and media to an operational update and presentation of the company’s first quarter 2026 financial results.\n\n","Andfjord Salmon invites investors, analysts, lenders and media to an operational update and presentation of the company’s first quarter 2026 financial results.\n","0dec986a-2950-4f60-b338-6e6cce17999c",[927,933],{"id":17,"_uid":928,"ctas":929,"text":17,"media":930,"title":913,"useH1":30,"overlay":932,"component":34,"show_down_arrow":30,"content_alignment":35},"d8bf339e-e205-4cce-a107-7627fa9bce64",[],{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":775,"height":776,"source":17,"filename":777,"copyright":17,"fieldtype":26,"meta_data":931,"public_id":779,"aspect_ratio":780,"is_external_url":29},{},{"value":187,"plugin":33},{"id":17,"_uid":934,"theme":38,"content":935,"component":81,"vertical_padding":717},"ebcf1e41-5427-4690-89be-ad69bc944545",{"type":40,"content":936},[937,942,949,958,967,976,981,990,1000,1005,1010,1014,1020,1025,1032,1037,1041],{"type":43,"attrs":938,"content":939},{"textAlign":153},[940],{"text":941,"type":47},"22 May 2026",{"type":43,"attrs":943,"content":944},{"textAlign":153},[945],{"text":946,"type":47,"marks":947},"Andfjord Salmon Group AS (Andfjord Salmon) invites investors, analysts, lenders and media to an operational update and presentation of the company’s first quarter 2026 financial results. ",[948],{"type":50},{"type":43,"attrs":950,"content":951},{"textAlign":153},[952,956],{"text":953,"type":47,"marks":954},"Date:",[955],{"type":50},{"text":957,"type":47}," Thursday 28 May 2026",{"type":43,"attrs":959,"content":960},{"textAlign":153},[961,965],{"text":962,"type":47,"marks":963},"Time:",[964],{"type":50},{"text":966,"type":47}," 08:00 CET",{"type":43,"attrs":968,"content":969},{"textAlign":153},[970,974],{"text":971,"type":47,"marks":972},"Presenters:",[973],{"type":50},{"text":975,"type":47}," CEO Martin Rasmussen and CFO Bjarne Martinsen",{"type":43,"attrs":977,"content":978},{"textAlign":153},[979],{"text":980,"type":47},"The presentation will be held physically in Oslo and streamed online. ",{"type":43,"attrs":982,"content":983},{"textAlign":153},[984,988],{"text":985,"type":47,"marks":986},"Venue:",[987],{"type":50},{"text":989,"type":47}," House of Oslo (the auditorium), Ruseløkkveien 34, 0251 Oslo, Norway",{"type":43,"attrs":991,"content":992},{"textAlign":153},[993,994,998],{"text":629,"type":47},{"text":631,"type":47,"marks":995},[996],{"type":631,"attrs":997},{"href":827,"uuid":153,"anchor":153,"target":636,"linktype":432},{"text":999,"type":47},". ",{"type":43,"attrs":1001,"content":1002},{"textAlign":153},[1003],{"text":1004,"type":47},"The presentation will be held in English. Questions can be submitted during the live webcast. ",{"type":43,"attrs":1006,"content":1007},{"textAlign":153},[1008],{"text":1009,"type":47},"The presentation material will be published at 07:00 CET on the same day.",{"type":473,"attrs":1011,"content":1012},{"level":516,"textAlign":153},[1013],{"text":665,"type":47},{"type":43,"attrs":1015,"content":1016},{"textAlign":153},[1017],{"text":851,"type":47,"marks":1018},[1019],{"type":50},{"type":43,"attrs":1021,"content":1022},{"textAlign":153},[1023],{"text":1024,"type":47},"Martin Rasmussen, CEO, Andfjord Salmon AS, +47 975 08 665, martin@andfjord.no ",{"type":43,"attrs":1026,"content":1027},{"textAlign":153},[1028],{"text":1029,"type":47,"marks":1030},"Investors: ",[1031],{"type":50},{"type":43,"attrs":1033,"content":1034},{"textAlign":153},[1035],{"text":1036,"type":47},"Bjarne Martinsen, CFO, Andfjord Salmon AS, +47 975 08 345, bjarne.martinsen@andfjord.no ",{"type":473,"attrs":1038,"content":1039},{"level":516,"textAlign":153},[1040],{"text":709,"type":47},{"type":43,"attrs":1042,"content":1043},{"textAlign":153},[1044],{"text":1045,"type":47},"Located at Andøya on the Arctic Archipelago of Vesterålen, Norway, Andfjord Salmon is developing the world’s most sustainable and fish-friendly aquaculture facility of its kind. Through a proprietary flow-through system, Andfjord Salmon combines the best from ocean and land-based salmon farming. In its first production cycle, the company achieved an industry-leading survival rate of 97.5 percent, feed conversion ratio of 1.05, superior share of 91.1 percent, and required 1 kWh to produce one kilo of salmon.",{"id":17,"alt":17,"name":17,"focus":17,"title":17,"width":775,"height":776,"source":17,"filename":767,"copyright":17,"fieldtype":26,"meta_data":1047,"public_id":873,"aspect_ratio":780,"is_external_url":29},{},[1049,1053],{"name":166,"created_at":740,"published_at":741,"updated_at":742,"id":743,"uuid":726,"content":1050,"slug":745,"full_slug":746,"sort_by_date":153,"position":154,"tag_list":1051,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":748,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":1052,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},{"_uid":149,"name":166,"component":150},[],[],{"name":142,"created_at":143,"published_at":144,"updated_at":145,"id":146,"uuid":147,"content":1054,"slug":151,"full_slug":152,"sort_by_date":153,"position":154,"tag_list":1055,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":157,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":1056,"default_full_slug":153,"translated_slugs":153,"_stopResolving":30},{"_uid":149,"name":142,"component":150},[],[],"invitation-to-q1-2026-results-presentation","en/website/news/invitation-to-q1-2026-results-presentation",-3390,[142,166],"389e2dbc-8cc2-47c6-8a55-383a8fa11423",[],1779970480,[1065,1069,1073,1077],{"name":166,"created_at":740,"published_at":741,"updated_at":742,"id":743,"uuid":726,"content":1066,"slug":745,"full_slug":746,"sort_by_date":153,"position":154,"tag_list":1067,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":748,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":1068,"default_full_slug":153,"translated_slugs":153},{"_uid":149,"name":166,"component":150},[],[],{"name":890,"created_at":891,"published_at":878,"updated_at":892,"id":893,"uuid":894,"content":1070,"slug":897,"full_slug":898,"sort_by_date":153,"position":899,"tag_list":1071,"is_startpage":29,"parent_id":886,"meta_data":153,"group_id":901,"first_published_at":902,"release_id":153,"lang":159,"path":153,"alternates":1072,"default_full_slug":153,"translated_slugs":153},{"_uid":896,"name":890,"component":150},[],[],{"name":142,"created_at":143,"published_at":144,"updated_at":145,"id":146,"uuid":147,"content":1074,"slug":151,"full_slug":152,"sort_by_date":153,"position":154,"tag_list":1075,"is_startpage":29,"parent_id":156,"meta_data":153,"group_id":157,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":1076,"default_full_slug":153,"translated_slugs":153},{"_uid":149,"name":142,"component":150},[],[],{"name":876,"created_at":877,"published_at":878,"updated_at":879,"id":880,"uuid":881,"content":1078,"slug":883,"full_slug":884,"sort_by_date":153,"position":154,"tag_list":1079,"is_startpage":29,"parent_id":886,"meta_data":153,"group_id":887,"first_published_at":158,"release_id":153,"lang":159,"path":153,"alternates":1080,"default_full_slug":153,"translated_slugs":153},{"_uid":149,"name":876,"component":150},[],[],[],{"age":1083,"cache-control":1084,"connection":1085,"content-encoding":1086,"content-type":1087,"date":1088,"etag":1089,"per-page":1083,"referrer-policy":1090,"sb-be-version":1091,"server":1092,"total":1093,"transfer-encoding":1094,"vary":1095,"via":1096,"x-amz-cf-id":1097,"x-amz-cf-pop":1098,"x-cache":1099,"x-content-type-options":1100,"x-frame-options":1101,"x-permitted-cross-domain-policies":1102,"x-request-id":1103,"x-runtime":1104,"x-xss-protection":1105},"3","max-age=0, public, s-maxage=604800, stale-if-error=3600","keep-alive","gzip","application/json; charset=utf-8","Thu, 28 May 2026 12:15:37 GMT","W/\"61ad595b25dad96dc45e0e9838981b7b\"","strict-origin-when-cross-origin","5.883.0","nginx/1.29.1","378","chunked","Origin,Accept-Encoding","1.1 65ed266dda094f56ecb91fc422768658.cloudfront.net (CloudFront)","hp2Y7dHkIXDBCVIH94HjlG-EBWly3UyVUxFZrdvbhJBiJetQweeCtQ==","IAD55-P6","Hit from cloudfront","nosniff","SAMEORIGIN","none","540b48ac-48dd-447a-bc7e-ebf91b318a38","0.052010","0",3,378,1779970540680]